Pre-Renovation: Design Plans, Blueprints, and Estimates

By Lisa Skolnik, Studio One Networks

Once you've decided on your renovation project, you're ready to draw up preliminary plans, turn them into finished blueprints, and get estimates for the work.

Everyone from your local building department to contractor to subcontractors to material suppliers will use the finished blueprints. Consequently, they must be comprehensive, precise, and most importantly, accurate.

  • Design Plans: List specific details such as size, shape, amenities, materials, finishes, architectural details, and layout of the finished project. This helps the architect, designer, or contractor create an (hopefully!) accurate rough draft or schematic plans (usually done on a 1/8 to 1 foot scale).

    Another set of plans (drawn in greater detail on a larger, 1/4 inch, scale) should include your input, changes, and the advice of other experts.

  • Blueprints: Once you are satisfied with the plans, the architect will create final working drawings (in 1/4-inch or 1/2-inch to 1 foot scale), detailing every element of the project, such as elevations, floor plans, wall placements, windows, heating and electrical systems, plumbing, lighting plans, cabinetry, roof lines, and all necessary specifications detailing materials, brands, colors and finishes.

    These blueprints (named so because of the color of the ink) are the roadmap for your renovation. Design details and specifications should be listed on separate sheets and attached to the blueprints.

  • Estimates: As plans are being revised, the draftsman will run them by contractors, suppliers, and tradesmen to get ballpark cost estimates. When the final blueprints are complete, get three bids for your project from different general contractors or builders.

    If you're acting as your own general contractor, you will need to submit a blueprint to three members of each trade you'll need, including plumbers, electricians, painters, bricklayers, etc.

    Each bid should be submitted in writing with specifics on measurements, work steps, and materials (including brand names) for every aspect of the task from preparation to completion, including how long the project will take. Costs should be broken down by line item. And the contractor should give you a total price for the entire project.

    Bids are typically valid for 30 days, but can sometimes go for 60 days, especially if they are high or the project is large.

Copyright (c) 2008 Studio One Networks. All rights reserved.

*DISCLAIMER*: The information contained in or provided through this site section is intended for general consumer understanding and education only and is not intended to be and is not a substitute for professional advice. Use of this site section and any information contained on or provided through this site section is at your own risk and any information contained on or provided through this site section is provided on an "as is" basis without any representations or warranties.
Powered by WorldNow
All content © Copyright 2000 - 2014 WorldNow and KTIV Television Inc. All Rights Reserved.
For more information on this site, please read our Privacy Policy, Terms of Service and Mobile Privacy Policy & Terms of Service.

Persons with disabilities who need assistance with issues relating to the content of this station's public inspection file should contact Administrative Assistant Kathy Clayton at (712) 239-4100 x209. Questions or concerns relating to the accessibility of the FCC's online public file system should be directed to the FCC at 888-225-5322, at 888-835-5322 (TTY) or at fccinfo@fcc.gov.